From Consultation to Implementation: Customized Waste Gas Treatment Services
Precision matching enterprise needs • Leading green manufacturing transformation • 15 years expertise • 500+ successful cases
Why Customization is Essential
Industrial waste gas treatment complexity demands tailored solutions. Different industries produce vastly different gas compositions requiring precise identification and targeted treatment approaches.
Chemical Industry VOCs: 500-5000mg/m³ concentrations with hundreds of components
Automotive Spray Waste: Complex organic solvents with paint mist, 20,000-100,000m³/h volumes
Pharmaceutical Odors: Low-concentration but extremely low odor threshold malodorous substances
Metal Processing Gases: Highly corrosive HCl, H?SO?, NaOH requiring specialized materials
Our Precision Matching Process
In-depth consultation & precise diagnosis using GC-MS analysis for complete gas component fingerprinting
Solution design & technology comparison with intelligent integration of optimal processes
Lean manufacturing & standardized installation ensuring quality assurance
Intelligent commissioning & worry-free O&M with data-driven long-term stability
Technology Selection Matrix
RTO Thermal ≥99% removal >2000mg/m³
RCO Catalytic ≥95% removal 800-2000mg/m³
Zeolite + RTO ≥98% removal 200-800mg/m³
Multi-stage Scrubber ≥99% removal acid-base gases
Investment costs range from 30-200 thousand yuan per 10,000m³/h capacity, with operating costs 8-35 yuan per 10,000m³ treated.
Success Case: Automotive Parts Manufacturing
Challenge: 75,000m³/h waste gas with complex VOCs and paint mist, 65% treatment efficiency with high costs.
Solution: Three-stage dry filtration + zeolite wheel concentration (15x) + three-chamber RTO thermal oxidation
Results after 18 months:
VOCs removal rate: 98.8% (national standard ≤60mg/m³, achieved ≤8mg/m³)
Natural gas savings: 350,000 yuan/year through heat recovery
Comprehensive O&M cost reduction: 42% vs original solution
Successfully passed central environmental inspection
Investment Return Analysis
Typical 50,000m³/h Project Investment:
Total Investment 9.56 million yuan
Annual Operating Cost 1.69 million yuan
Energy Savings 500,000 yuan/year
Payback Period 5.2 years (with tax incentives)
Ready to Transform Your Environmental Compliance?
Partner with us for customized waste gas treatment solutions. 15 years expertise, 500+ successful cases, guaranteed compliance, optimized costs.